2 bridges and a tunnel is the 18 km extended fixed link across the Great Belt.
Building process on the Great Belt took site from 1988-1998. The main road crosswise the Great Belt opened in 1998 and the railway track in 1997. Passing of the Bridgework is best complete by getting a Bropas
The entire building price for the full Great Belt design added up to 21.4 billion. The cost was used virtually evenly ‘tween road and train links. East Bridge East fixed link ‘tween Zealand and Sprogoe is 6790 m long. East fixed link comprises of a sub structure and a superstructure.
During the building of concrete cover power pylons, anchor cubes, piles and earth hilts. Superstructure of the steel span covers and cables. The actual suspension bridge ‘tween the 2 keystone blocks are approx. 2700 m long. Hanging Bridgework comprises of the clear bridge ‘tween 2 power pylons at 1624 meter plus the two page spread ‘tween the pylons and keystone cubes, each 535 meter. Suspension Bridgework is connected with 23 connective parts (14 from Zealand and 9 from Sprogoe). The East Tunnel for rail travel is 8024 meter long and comprises of two separate tubes with one trail each. The two subways are connected by 31 cross burrows and serves as an escape route, and providing fundamental facilities. The East Tunnel is a drilled tunnel.
The elements were constructed at a temporary on site manufacturing plant. From ocean floor to the top of the tunnel is between 12 and 40 meters. The tunnel is at its lowest point 75 meter below sea level. The West Bridgework, a mixed road and rail bridge is 6,611 feet long. The West Bridgework is actually two parallel spans, one for the road and a train. Reach us for more info at SEO